PROJECT
|
INVESTOR
|
|
400 kV – Feasibility Study for strengthening Croatian transmission network and interconnection with BiH, including Conceptual Design
|
HOPS / EIHP
|
|
Reconstruction of transmission lines in North Macedonia:
- 110 kV Bitola 1 – Prilep 1,
- 110 kV Veleš – Ovče Polje,
- 110 kV Skopje 4 – Veleš
|
MEPSO / Dalekovod d.d. & ELNOS
|
|
400 kV Podgorica – Albania border, Main Design
|
OST & CGES
|
|
2×110 kV Peja 3 – Peja 1, Conceptual, Main and Detailed Design
|
KOSTT, Kosovo
|
|
400 kV TS Kosovo B – Albania border, Conceptual, Main and Detailed Design
|
KOSTT / Dalekovod d.d.
|
|
Detailed spatial plan for 400 kV line between Lastva and Pljevlja with optical link and 500 kV HVDC submarine cable between Italy and Montenegro
|
Ministarstvo uređenja prostora i zaštite okoliša, Crna Gora
|
|
Conceptual design of 110 kV line reconstruction Podgorica – Trebješica – Andrijevica
|
CGES
|
|
220 kV line Trebinje – Hodovo to TS 220/33 kV Stolac 3, Conceptual and Main Design
|
JP „Elektroprivreda HZ HB“ d.d. Mostar
|
|
2x220 kV connection for VE Široka Draga, Conceptual and Main Design
|
Elektroprijenos BIH – Elektroprijenos BIH AD Banja Luka
|
|
110 kV Tomislavgrad – Kupres, Detailed Design
|
Elektroprijenos BIH – Elektroprijenos BIH AD Banja Luka
|
|
110 kV Rama – Uskoplje, Main Design
|
Elektroprijenos BIH – Elektroprijenos BIH AD Banja Luka
|